Home / Blog / Moving house checklist

Moving guides

The moving house checklist that leaves nothing behind.

A move goes wrong in the small forgotten things: the mail that never got redirected, the fridge that was still full on the day, the keys handed over before the last box was out. This is the countdown we give our own customers, stage by stage from eight weeks out to your first morning in the new place. Work through it in order and moving day becomes the easy part.

Moving is not one big job. It is a hundred small ones, and the stress comes from trying to do them all at once in the final week. The fix is simple: spread the work across the weeks you have, and do each thing when it is easiest to do. This checklist breaks the whole move into seven stages, from eight weeks out to after you have unpacked. Start wherever your date lands. If you only have three weeks, jump in at the four-week stage and keep going. Every task here is concrete, so you can tick it off and move on.

Eight weeks before the move

This is planning time, and it is worth more than any other week. The decisions you make now, especially who moves you and on what date, shape how the whole thing goes.

Six weeks before

Now you turn the plan into supplies and paperwork. Getting these moving early means the final weeks are about packing, not chasing.

Four weeks before

Packing begins in earnest, starting with everything you will not miss. This is also when you line up the services that need lead time.

Two weeks before

The pace picks up. Most of the house should be packable now, leaving only the essentials you use daily.

The week of the move

This is the final run. Everything should be nearly done, so the last days are calm rather than frantic.

Moving day

If the earlier stages are done, today is mostly about being available and letting the crew work. Your job is coordination, not heavy lifting.

After you move

The truck is unloaded, but a few loose ends remain. Tie them off in the first week and the new place becomes home faster.

Work through this in order and the move stops being one overwhelming day and becomes a series of small, manageable ones. When you are ready to lock in the crew, we make that part simple. Our quotes are capped in writing before we lift a box, so the number you plan around is the number you pay. Get your free capped quote and cross the biggest task off this list today.

Ready to book
the movers?

Cross the biggest job off your checklist. Get a free, capped, fully insured quote with no hourly clock and no surprises on the day.

Get a free quote
Prefer to talk? Call 0483 300 006, 7 days a week, 7am to 7pm.
Call us Free quote